Jln Bt Merah HDB Resale Flat Transactions

Search our database for Singapore public housing property transactions for the HDB resale flat prices in the past 15 years. You can filter the results by the HDB town or street name and the type of flat.

The data is based on registered HDB resale applications. It acts as a guideline on potential cash over valuation (COV) for the HDB buyers.

The resale flat data was last updated on 19th May 2024, 11:00 AM.

Town

Street Name

Flat Type

Jln Bt Merah HDB Resale Price

Month Town Block Street Name Flat Type Flat Model Storey Range Floor Area Resale Price Lease Start RemainingLease
May 2024 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $398,000 1975 50 years
May 2024 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 81 m2 $488,888 1981 56 years
April 2024 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 01 TO 03 128 m2 $862,888 1997 71 years
April 2024 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 10 TO 12 68 m2 $438,088 1983 58 years
April 2024 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 25 TO 27 105 m2 $875,000 1996 71 years
April 2024 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 07 TO 09 129 m2 $958,888 1997 71 years
April 2024 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $400,000 1981 56 years
April 2024 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $460,000 1984 59 years
April 2024 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $310,000 1969 43 years
April 2024 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $270,000 1967 42 years
March 2024 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $325,000 1975 50 years
March 2024 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $380,000 1981 56 years
March 2024 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $318,000 1969 43 years
March 2024 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $360,000 1976 50 years
March 2024 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 01 TO 03 64 m2 $355,500 1983 58 years
March 2024 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $408,000 1975 50 years
March 2024 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 03 70 m2 $380,888 1975 50 years
March 2024 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 81 m2 $492,888 1981 56 years
March 2024 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $400,000 1983 58 years
March 2024 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $300,000 1969 43 years
March 2024 BUKIT MERAH 138 JLN BT MERAH 5 ROOM Adjoined flat 04 TO 06 118 m2 $720,000 1983 58 years
March 2024 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $720,000 1979 54 years
February 2024 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $307,500 1967 42 years
February 2024 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 13 TO 15 60 m2 $305,000 1967 42 years
February 2024 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $393,000 1981 56 years
February 2024 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $650,000 1979 54 years
February 2024 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 71 m2 $350,000 1969 43 years
January 2024 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $330,000 1970 45 years
January 2024 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $373,000 1975 50 years
January 2024 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $315,000 1967 42 years
January 2024 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 19 TO 21 119 m2 $778,000 1979 54 years
December 2023 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $920,000 1996 72 years
December 2023 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $370,000 1983 58 years
November 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $340,000 1970 45 years
November 2023 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $325,000 1975 50 years
November 2023 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $398,000 1981 56 years
November 2023 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $647,000 1984 59 years
November 2023 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $368,000 1979 54 years
November 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $345,000 1970 45 years
November 2023 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 106 m2 $693,000 1997 72 years
October 2023 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 13 TO 15 47 m2 $300,000 1967 42 years
October 2023 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $392,000 1983 58 years
October 2023 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $349,000 1975 50 years
October 2023 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $378,000 1975 50 years
October 2023 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $720,000 1997 72 years
October 2023 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $890,000 1996 72 years
September 2023 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $425,000 1990 65 years
September 2023 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 07 TO 09 128 m2 $890,000 1997 72 years
September 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $480,000 1970 45 years
September 2023 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $318,888 1975 50 years
September 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $310,000 1970 45 years
August 2023 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $540,000 1984 60 years
August 2023 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $618,000 1984 60 years
August 2023 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $290,000 1967 42 years
August 2023 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $290,000 1967 42 years
August 2023 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 01 TO 03 68 m2 $377,000 1990 65 years
August 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $328,000 1970 45 years
August 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $340,000 1970 45 years
August 2023 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 81 m2 $485,000 1981 57 years
August 2023 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 22 TO 24 105 m2 $818,000 1996 72 years
July 2023 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 07 TO 09 109 m2 $690,000 1997 72 years
July 2023 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 13 TO 15 128 m2 $870,000 1996 72 years
July 2023 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $383,888 1981 57 years
June 2023 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $360,000 1976 51 years
June 2023 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 71 m2 $360,000 1969 44 years
June 2023 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $647,000 1984 60 years
June 2023 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $405,000 1979 54 years
May 2023 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 07 TO 09 106 m2 $750,000 1996 72 years
May 2023 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 13 TO 15 117 m2 $708,000 1981 57 years
May 2023 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $365,000 1975 51 years
May 2023 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 10 TO 12 100 m2 $722,000 1996 72 years
April 2023 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $300,000 1967 43 years
April 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $310,000 1970 45 years
April 2023 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 10 TO 12 119 m2 $760,000 1979 54 years
April 2023 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $360,000 1975 51 years
April 2023 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 16 TO 18 123 m2 $862,000 1996 72 years
April 2023 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Model A 07 TO 09 135 m2 $822,888 1997 72 years
March 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $310,000 1970 45 years
March 2023 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 10 TO 12 128 m2 $860,000 1997 72 years
March 2023 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 16 TO 18 127 m2 $870,000 1996 72 years
February 2023 BUKIT MERAH 11 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $482,000 1988 64 years
February 2023 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $328,000 1967 43 years
February 2023 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 07 TO 09 91 m2 $575,000 1981 57 years
February 2023 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Model A 01 TO 03 135 m2 $815,000 1997 72 years
February 2023 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Model A 04 TO 06 132 m2 $835,000 1996 72 years
January 2023 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $372,888 1979 55 years
January 2023 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $345,000 1970 46 years
January 2023 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $390,000 1976 52 years
January 2023 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $270,000 1967 43 years
January 2023 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $320,000 1983 59 years
January 2023 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 07 TO 09 117 m2 $676,800 1981 58 years
January 2023 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $315,000 1975 51 years
December 2022 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $330,000 1983 59 years
December 2022 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 10 TO 12 107 m2 $673,000 1997 73 years
December 2022 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 01 TO 03 121 m2 $795,000 1997 73 years
December 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $280,000 1970 46 years
December 2022 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $325,000 1983 59 years
December 2022 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $365,000 1979 55 years
December 2022 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $371,100 1983 59 years
December 2022 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $345,900 1983 59 years
November 2022 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $350,000 1979 55 years
November 2022 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $310,000 1967 43 years
November 2022 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $300,000 1969 45 years
November 2022 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $358,888 1975 51 years
November 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $326,000 1970 46 years
November 2022 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 81 m2 $458,888 1981 58 years
October 2022 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 82 m2 $420,000 1979 55 years
October 2022 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $312,888 1975 51 years
October 2022 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 01 TO 03 110 m2 $565,000 1984 60 years
September 2022 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $350,000 1983 60 years
September 2022 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $290,000 1975 51 years
September 2022 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $320,000 1969 45 years
September 2022 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $350,000 1983 59 years
August 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $305,000 1970 46 years
August 2022 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 76 m2 $360,000 1976 52 years
August 2022 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $328,000 1983 60 years
August 2022 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $305,000 1975 51 years
August 2022 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $400,000 1990 66 years
August 2022 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $658,000 1979 55 years
August 2022 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $718,000 1979 55 years
July 2022 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 07 TO 09 121 m2 $808,000 1997 73 years
July 2022 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $330,000 1979 55 years
July 2022 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $380,000 1975 51 years
July 2022 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $358,000 1979 55 years
July 2022 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 04 TO 06 124 m2 $790,000 1996 73 years
July 2022 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 01 TO 03 68 m2 $348,000 1990 66 years
June 2022 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $321,888 1983 60 years
June 2022 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $307,000 1983 60 years
June 2022 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $468,000 1984 61 years
June 2022 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $685,000 1979 55 years
June 2022 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $355,000 1983 59 years
June 2022 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $335,000 1969 45 years
May 2022 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 10 TO 12 74 m2 $422,000 1984 61 years
May 2022 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $618,888 1997 73 years
May 2022 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $405,000 1979 55 years
May 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $290,500 1970 46 years
May 2022 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 10 TO 12 105 m2 $705,000 1996 73 years
May 2022 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 19 TO 21 117 m2 $675,000 1981 58 years
May 2022 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 04 TO 06 72 m2 $403,000 1990 66 years
May 2022 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $320,000 1967 44 years
May 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $303,000 1970 46 years
May 2022 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $300,000 1979 55 years
April 2022 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $320,000 1967 44 years
April 2022 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $310,000 1983 60 years
March 2022 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $320,000 1967 44 years
February 2022 BUKIT MERAH 2 JLN BT MERAH 5 ROOM Adjoined flat 10 TO 12 126 m2 $668,888 1975 52 years
February 2022 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $400,000 1984 61 years
January 2022 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $308,000 1975 52 years
January 2022 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $270,000 1970 47 years
January 2022 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $322,000 1979 56 years
January 2022 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $350,000 1981 58 years
January 2022 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $610,000 1997 74 years
January 2022 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $577,500 1979 56 years
January 2022 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 82 m2 $405,000 1979 56 years
December 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $255,000 1967 44 years
December 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $303,000 1975 52 years
December 2021 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $360,000 1984 61 years
December 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $277,000 1970 47 years
November 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $272,000 1967 44 years
November 2021 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $270,000 1975 52 years
November 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $308,888 1979 56 years
November 2021 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $290,000 1975 52 years
November 2021 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $320,000 1983 60 years
November 2021 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $368,000 1979 56 years
November 2021 BUKIT MERAH 11 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $335,000 1988 65 years
November 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $328,000 1979 56 years
November 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $288,000 1967 44 years
November 2021 BUKIT MERAH 141 JLN BT MERAH 4 ROOM New Generation 04 TO 06 92 m2 $468,000 1979 56 years
November 2021 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 16 TO 18 105 m2 $715,000 1996 74 years
November 2021 BUKIT MERAH 144 JLN BT MERAH 4 ROOM New Generation 07 TO 09 91 m2 $508,000 1981 58 years
October 2021 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $290,000 1975 52 years
October 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $268,000 1970 47 years
October 2021 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $265,000 1969 46 years
October 2021 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $298,000 1983 60 years
October 2021 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $338,888 1975 52 years
October 2021 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 71 m2 $323,000 1969 46 years
October 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $308,000 1979 56 years
October 2021 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $418,000 1984 61 years
October 2021 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $738,000 1997 74 years
October 2021 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 105 m2 $540,000 1984 61 years
October 2021 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 04 TO 06 92 m2 $435,000 1979 56 years
September 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $280,000 1970 47 years
September 2021 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $790,000 1997 74 years
September 2021 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 10 TO 12 92 m2 $510,000 1979 56 years
September 2021 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 81 m2 $423,000 1981 59 years
September 2021 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $348,000 1983 60 years
September 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $325,000 1979 56 years
September 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $290,000 1975 52 years
September 2021 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Model A 04 TO 06 132 m2 $825,000 1997 74 years
August 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $322,000 1979 56 years
August 2021 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 68 m2 $310,000 1983 61 years
August 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $278,000 1970 47 years
August 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $270,000 1970 47 years
August 2021 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 01 TO 03 121 m2 $690,000 1997 74 years
August 2021 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $418,000 1984 62 years
August 2021 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 81 m2 $393,000 1981 59 years
August 2021 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $730,000 1997 74 years
July 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $270,000 1970 47 years
July 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 13 TO 15 60 m2 $270,000 1967 45 years
July 2021 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 58 m2 $265,000 1969 46 years
July 2021 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $560,000 1979 56 years
July 2021 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $295,000 1983 61 years
July 2021 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $650,000 1979 56 years
June 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $305,888 1979 56 years
June 2021 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $260,000 1975 53 years
June 2021 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $330,000 1981 59 years
June 2021 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $315,000 1979 56 years
June 2021 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 10 TO 12 65 m2 $315,000 1976 53 years
June 2021 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $350,000 1981 59 years
June 2021 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 07 TO 09 81 m2 $390,000 1981 59 years
June 2021 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $350,000 1979 56 years
May 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $270,000 1970 47 years
May 2021 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $300,000 1976 53 years
May 2021 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $510,000 1979 56 years
May 2021 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 10 TO 12 108 m2 $595,000 1997 74 years
May 2021 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $340,000 1981 59 years
April 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $286,000 1975 53 years
April 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $255,000 1967 45 years
April 2021 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $345,000 1981 59 years
April 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $303,000 1975 53 years
April 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $290,000 1975 53 years
April 2021 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $360,000 1981 59 years
April 2021 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $540,000 1984 62 years
April 2021 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $414,000 1984 62 years
April 2021 BUKIT MERAH 141 JLN BT MERAH EXECUTIVE Adjoined flat 07 TO 09 162 m2 $720,000 1979 56 years
April 2021 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 19 TO 21 119 m2 $665,000 1979 56 years
April 2021 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 10 TO 12 108 m2 $628,000 1997 74 years
March 2021 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $256,000 1975 53 years
March 2021 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $308,000 1976 53 years
March 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $265,000 1970 47 years
March 2021 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $310,000 1975 53 years
March 2021 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 19 TO 21 100 m2 $680,000 1996 74 years
March 2021 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $513,000 1984 62 years
February 2021 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 10 TO 12 105 m2 $670,000 1996 74 years
February 2021 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Model A 04 TO 06 132 m2 $780,000 1996 74 years
February 2021 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $730,000 1997 74 years
February 2021 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $255,000 1970 48 years
January 2021 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $235,000 1967 45 years
January 2021 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $300,000 1976 54 years
January 2021 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 70 m2 $290,000 1975 53 years
January 2021 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $270,000 1975 53 years
January 2021 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $268,000 1975 53 years
January 2021 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 13 TO 15 100 m2 $648,000 1996 74 years
January 2021 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 01 TO 03 103 m2 $590,000 1996 74 years
January 2021 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 10 TO 12 104 m2 $500,000 1984 62 years
January 2021 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 25 TO 27 119 m2 $650,000 1979 57 years
December 2020 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $320,000 1979 57 years
December 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $258,000 1975 53 years
December 2020 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $286,000 1983 61 years
December 2020 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 13 TO 15 105 m2 $628,000 1997 75 years
December 2020 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 07 TO 09 127 m2 $715,000 1997 75 years
December 2020 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $505,000 1979 57 years
December 2020 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 01 TO 03 124 m2 $640,000 1996 75 years
December 2020 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $335,000 1981 60 years
December 2020 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $300,000 1981 59 years
November 2020 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $276,000 1983 61 years
November 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $268,000 1975 53 years
November 2020 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $290,000 1979 57 years
November 2020 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 105 m2 $508,888 1984 62 years
November 2020 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $240,888 1975 53 years
November 2020 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $300,000 1979 57 years
November 2020 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $600,000 1996 75 years
November 2020 BUKIT MERAH 144 JLN BT MERAH 4 ROOM New Generation 04 TO 06 91 m2 $484,000 1981 59 years
October 2020 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 82 m2 $348,800 1979 57 years
October 2020 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 01 TO 03 103 m2 $558,000 1996 75 years
October 2020 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $308,000 1983 61 years
October 2020 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $295,000 1981 60 years
October 2020 BUKIT MERAH 141 JLN BT MERAH 4 ROOM New Generation 01 TO 03 92 m2 $482,000 1979 57 years
September 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $255,000 1975 53 years
September 2020 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $290,000 1976 54 years
September 2020 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 22 TO 24 105 m2 $672,800 1996 75 years
September 2020 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $282,000 1979 57 years
August 2020 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $315,000 1981 60 years
August 2020 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $310,000 1979 57 years
August 2020 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $245,000 1975 53 years
August 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $280,000 1975 53 years
August 2020 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 04 TO 06 117 m2 $650,000 1981 60 years
July 2020 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $240,000 1975 54 years
July 2020 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $272,000 1983 62 years
July 2020 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $380,000 1984 63 years
July 2020 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $243,000 1975 53 years
July 2020 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 07 TO 09 107 m2 $553,000 1997 75 years
July 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $290,000 1975 53 years
July 2020 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $255,000 1983 62 years
July 2020 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 10 TO 12 100 m2 $645,000 1996 75 years
July 2020 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 10 TO 12 120 m2 $713,000 1997 75 years
June 2020 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $240,000 1970 48 years
June 2020 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $234,000 1970 48 years
June 2020 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $180,000 1967 46 years
June 2020 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 07 TO 09 107 m2 $615,000 1997 75 years
June 2020 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $274,000 1975 54 years
June 2020 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $245,000 1975 54 years
May 2020 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $300,000 1983 62 years
March 2020 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 01 TO 03 64 m2 $290,000 1983 62 years
March 2020 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $270,000 1975 54 years
March 2020 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $265,000 1983 62 years
March 2020 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 07 TO 09 102 m2 $620,000 1996 75 years
March 2020 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 01 TO 03 127 m2 $730,000 1997 75 years
March 2020 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 16 TO 18 119 m2 $652,000 1979 57 years
February 2020 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $520,000 1997 75 years
February 2020 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $630,000 1996 75 years
February 2020 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 103 m2 $620,000 1997 75 years
February 2020 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $292,000 1983 62 years
January 2020 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 76 m2 $298,000 1976 55 years
January 2020 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 04 TO 06 108 m2 $590,000 1996 75 years
January 2020 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $195,000 1967 46 years
December 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $233,000 1970 49 years
December 2019 BUKIT MERAH 144 JLN BT MERAH 4 ROOM New Generation 04 TO 06 91 m2 $510,000 1981 60 years
December 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $310,000 1979 58 years
December 2019 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 04 TO 06 120 m2 $640,000 1997 76 years
November 2019 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $245,000 1975 54 years
November 2019 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $605,000 1996 76 years
November 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $276,800 1979 58 years
November 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $250,000 1979 58 years
October 2019 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 04 TO 06 74 m2 $355,000 1984 63 years
October 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 73 m2 $325,000 1975 54 years
October 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $275,000 1970 49 years
October 2019 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $310,000 1981 61 years
October 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $225,000 1970 49 years
September 2019 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $300,000 1983 62 years
September 2019 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $288,000 1976 55 years
September 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $235,000 1970 49 years
September 2019 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $320,000 1981 61 years
September 2019 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $320,000 1975 54 years
August 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 13 TO 15 60 m2 $260,000 1967 46 years
August 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $250,000 1970 49 years
August 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $240,000 1967 46 years
August 2019 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $466,000 1984 63 years
August 2019 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $290,000 1983 62 years
August 2019 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 10 TO 12 104 m2 $518,000 1984 63 years
August 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $274,000 1975 54 years
July 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $268,000 1975 54 years
July 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $260,000 1967 46 years
July 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $220,000 1970 49 years
July 2019 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 13 TO 15 123 m2 $760,000 1996 76 years
July 2019 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $315,000 1981 61 years
July 2019 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $295,000 1976 55 years
June 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $240,000 1975 55 years
June 2019 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 25 TO 27 127 m2 $860,000 1996 76 years
June 2019 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Model A 04 TO 06 132 m2 $670,000 1996 76 years
June 2019 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 81 m2 $320,000 1981 61 years
May 2019 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 10 TO 12 68 m2 $300,000 1983 63 years
May 2019 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $290,000 1983 63 years
May 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $208,000 1967 47 years
May 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $318,000 1979 58 years
May 2019 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 07 TO 09 103 m2 $583,000 1997 76 years
May 2019 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 10 TO 12 127 m2 $680,000 1996 76 years
April 2019 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $235,000 1976 55 years
April 2019 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $290,000 1975 55 years
April 2019 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $265,000 1975 55 years
April 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $240,000 1970 49 years
April 2019 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 104 m2 $480,000 1984 64 years
April 2019 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $616,800 1997 76 years
April 2019 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 10 TO 12 115 m2 $510,000 1984 64 years
March 2019 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $240,000 1970 49 years
March 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $240,000 1967 47 years
March 2019 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $185,000 1967 47 years
March 2019 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $280,000 1976 55 years
March 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $250,000 1979 58 years
March 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 73 m2 $340,000 1975 55 years
March 2019 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 108 m2 $550,000 1997 76 years
March 2019 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 13 TO 15 129 m2 $795,000 1997 76 years
March 2019 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 07 TO 09 117 m2 $655,000 1981 61 years
February 2019 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $270,000 1975 55 years
February 2019 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 13 TO 15 60 m2 $288,000 1967 47 years
January 2019 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $250,000 1969 49 years
January 2019 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 04 TO 06 47 m2 $200,000 1967 47 years
January 2019 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $190,000 1967 47 years
January 2019 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $280,000 1979 59 years
December 2018 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Model A 10 TO 12 132 m2 $788,000 1997 77 years
December 2018 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $343,000 1984 64 years
December 2018 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $260,000 1975 55 years
November 2018 BUKIT MERAH 11 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $350,000 1988 68 years
November 2018 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 68 m2 $340,000 1983 63 years
October 2018 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $272,500 1975 55 years
September 2018 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $240,000 1970 50 years
September 2018 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 106 m2 $580,000 1997 77 years
September 2018 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $320,000 1981 62 years
September 2018 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $295,000 1975 55 years
September 2018 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $285,000 1975 55 years
September 2018 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 10 TO 12 106 m2 $655,000 1996 77 years
August 2018 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 82 m2 $390,000 1979 59 years
August 2018 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $293,000 1983 64 years
August 2018 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $280,000 1970 50 years
August 2018 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 10 TO 12 100 m2 $650,000 1996 77 years
July 2018 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $250,000 1975 55 years
July 2018 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 16 TO 18 120 m2 $750,000 1997 77 years
July 2018 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 07 TO 09 109 m2 $502,000 1984 65 years
July 2018 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $358,000 1983 63 years
June 2018 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 13 TO 15 106 m2 $610,000 1997 77 years
June 2018 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $315,000 1976 56 years
June 2018 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $300,000 1976 56 years
June 2018 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $800,000 1996 77 years
June 2018 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 01 TO 03 117 m2 $575,000 1981 62 years
June 2018 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 13 TO 15 100 m2 $660,000 1996 77 years
May 2018 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $355,000 1984 65 years
May 2018 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 73 m2 $393,000 1975 56 years
April 2018 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $270,000 1969 49 years
April 2018 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $268,000 1975 56 years
April 2018 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $315,000 1981 62 years
April 2018 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $300,000 1976 56 years
April 2018 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $312,000 1983 64 years
March 2018 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $290,000 1970 50 years
March 2018 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $340,000 1979 59 years
January 2018 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $355,000 1984 65 years
January 2018 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 10 TO 12 107 m2 $580,000 1997 78 years
January 2018 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $300,000 1975 56 years
December 2017 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $333,000 1976 57 years
December 2017 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $306,000 1970 51 years
December 2017 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $270,000 1969 50 years
November 2017 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $295,000 1967 48 years
November 2017 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $358,000 1984 65 years
November 2017 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $321,000 1970 51 years
November 2017 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 82 m2 $365,000 1979 60 years
November 2017 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $360,117 1979 60 years
November 2017 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $310,000 1975 56 years
November 2017 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $300,000 1975 56 years
October 2017 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $288,000 1979 60 years
October 2017 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 19 TO 21 123 m2 $738,000 1996 78 years
October 2017 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $700,000 1979 60 years
October 2017 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 16 TO 18 117 m2 $673,000 1981 63 years
October 2017 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $260,000 1975 56 years
September 2017 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $340,000 1976 57 years
September 2017 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 10 TO 12 119 m2 $605,000 1979 60 years
August 2017 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $262,000 1975 56 years
August 2017 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $343,000 1975 56 years
August 2017 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $680,000 1997 78 years
August 2017 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 16 TO 18 107 m2 $618,000 1997 78 years
August 2017 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 82 m2 $415,000 1979 60 years
August 2017 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $298,888 1970 51 years
August 2017 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $280,000 1967 48 years
July 2017 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $348,000 1979 60 years
July 2017 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $338,000 1983 64 years
July 2017 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $337,000 1981 63 years
July 2017 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $560,000 1984 66 years
July 2017 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 104 m2 $534,000 1984 66 years
June 2017 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $308,000 1969 50 years
June 2017 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $342,000 1979 60 years
June 2017 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 104 m2 $542,888 1984 66 years
May 2017 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $380,000 1984 66 years
May 2017 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $340,000 1981 63 years
May 2017 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $318,000 1979 60 years
May 2017 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $300,000 1976 57 years
April 2017 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $260,000 1975 57 years
April 2017 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 68 m2 $295,000 1983 65 years
April 2017 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 73 m2 $345,000 1975 57 years
April 2017 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 81 m2 $395,000 1981 63 years
March 2017 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $310,000 1983 65 years
March 2017 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 10 TO 12 105 m2 $640,000 1996 78 years
March 2017 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $511,888 1984 66 years
February 2017 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $306,888 1967 49 years
February 2017 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $275,000 1975 57 years
February 2017 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $325,000 1975 57 years
January 2017 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $322,000 1976 58 years
January 2017 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $313,000 1979 61 years
January 2017 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $353,000 1976 58 years
January 2017 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $340,000 1979 61 years
January 2017 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 13 TO 15 103 m2 $608,000 1997 79 years
December 2016 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $292,000 1975 57 years
December 2016 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 07 TO 09 103 m2 $595,000 1997 79 years
December 2016 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $342,000 1981 63 years
November 2016 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $280,000 1983 65 years
October 2016 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 10 TO 12 65 m2 $338,000 1976 58 years
October 2016 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 04 TO 06 103 m2 $615,000 1996 79 years
October 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 82 m2 $400,000 1979 61 years
October 2016 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $700,000 1979 61 years
September 2016 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $260,000 1967 49 years
September 2016 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $320,000 1975 57 years
September 2016 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $670,000 1997 79 years
September 2016 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $570,000 1997 79 years
September 2016 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $288,000 1983 65 years
August 2016 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $320,000 1983 65 years
August 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $330,000 1979 61 years
August 2016 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $329,000 1981 64 years
August 2016 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $320,000 1970 52 years
August 2016 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 58 m2 $299,000 1969 51 years
August 2016 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $345,000 1975 57 years
July 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $320,000 1979 61 years
July 2016 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $285,000 1975 57 years
July 2016 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $330,000 1979 61 years
June 2016 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $363,000 1976 58 years
June 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $338,000 1979 61 years
June 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $318,000 1979 61 years
June 2016 BUKIT MERAH 141 JLN BT MERAH 4 ROOM New Generation 07 TO 09 92 m2 $485,000 1979 61 years
May 2016 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $329,000 1975 58 years
May 2016 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $600,000 1997 79 years
May 2016 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 80 m2 $370,000 1984 67 years
May 2016 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 13 TO 15 129 m2 $785,000 1997 79 years
May 2016 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $345,000 1979 61 years
April 2016 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 19 TO 21 123 m2 $790,000 1996 79 years
April 2016 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $385,000 1976 58 years
April 2016 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $338,000 1975 58 years
April 2016 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $805,000 1996 79 years
March 2016 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $325,000 1983 66 years
March 2016 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $310,000 1970 52 years
March 2016 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $290,000 1970 52 years
March 2016 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $338,000 1975 58 years
March 2016 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $336,000 1979 61 years
March 2016 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 81 m2 $438,000 1981 64 years
March 2016 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $511,000 1984 67 years
February 2016 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $322,000 1983 66 years
January 2016 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $350,000 1979 62 years
January 2016 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $289,000 1975 58 years
January 2016 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 106 m2 $600,000 1997 80 years
December 2015 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 07 TO 09 105 m2 $625,000 1996 79 years
December 2015 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $282,000 1983 66 years
December 2015 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $290,000 1975 58 years
November 2015 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $300,000 1983 66 years
November 2015 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 04 TO 06 47 m2 $270,000 1967 50 years
November 2015 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $318,000 1983 66 years
November 2015 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $333,000 1979 62 years
November 2015 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 13 TO 15 105 m2 $658,000 1996 80 years
October 2015 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $590,000 1997 80 years
October 2015 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $295,000 1983 66 years
October 2015 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $280,000 1970 53 years
October 2015 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 07 TO 09 128 m2 $765,000 1997 80 years
September 2015 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $325,000 1983 66 years
September 2015 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $320,000 1979 62 years
September 2015 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $325,000 1975 58 years
August 2015 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $335,000 1983 66 years
August 2015 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $330,000 1975 58 years
August 2015 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $325,000 1975 58 years
August 2015 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $300,000 1975 58 years
August 2015 BUKIT MERAH 145 JLN BT MERAH 4 ROOM New Generation 04 TO 06 91 m2 $505,000 1981 65 years
July 2015 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $320,000 1983 67 years
June 2015 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $328,000 1970 53 years
June 2015 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $315,888 1975 58 years
June 2015 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $377,800 1984 68 years
May 2015 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $346,000 1983 66 years
May 2015 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $320,000 1983 67 years
May 2015 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $730,000 1997 80 years
April 2015 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $309,000 1975 59 years
April 2015 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $315,000 1979 62 years
March 2015 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $282,000 1983 67 years
March 2015 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $272,000 1967 51 years
March 2015 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $295,000 1983 67 years
March 2015 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $335,000 1975 59 years
March 2015 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $333,000 1983 67 years
March 2015 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 10 TO 12 63 m2 $310,000 1975 59 years
March 2015 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $250,000 1967 51 years
March 2015 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $340,000 1969 52 years
March 2015 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 07 TO 09 91 m2 $440,000 1981 65 years
February 2015 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $345,000 1983 67 years
February 2015 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $320,000 1979 62 years
February 2015 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $580,000 1997 80 years
January 2015 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $355,000 1970 54 years
December 2014 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $375,000 1981
December 2014 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 105 m2 $565,000 1984
December 2014 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $310,000 1979
November 2014 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $340,000 1975
November 2014 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $336,000 1981
November 2014 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 105 m2 $510,000 1984
November 2014 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $368,000 1979
November 2014 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 10 TO 12 100 m2 $610,000 1996
October 2014 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 10 TO 12 107 m2 $590,000 1997
October 2014 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 04 TO 06 74 m2 $402,000 1984
October 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 01 TO 03 64 m2 $288,000 1983
October 2014 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 04 TO 06 109 m2 $657,000 1997
October 2014 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Model A 07 TO 09 132 m2 $820,000 1996
October 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $360,000 1983
September 2014 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $290,000 1975
September 2014 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $315,000 1981
September 2014 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $423,000 1979
September 2014 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 16 TO 18 60 m2 $360,000 1967
September 2014 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $340,000 1970
September 2014 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 13 TO 15 107 m2 $600,000 1997
August 2014 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $318,000 1975
August 2014 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $400,000 1976
August 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $375,000 1983
August 2014 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $348,000 1976
July 2014 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 61 m2 $330,000 1969
July 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $330,000 1983
July 2014 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $375,000 1981
July 2014 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $301,000 1969
June 2014 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $308,000 1983
June 2014 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 19 TO 21 117 m2 $645,000 1981
June 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $353,000 1983
May 2014 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $300,000 1967
May 2014 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $628,000 1979
May 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $345,000 1983
May 2014 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $300,000 1983
May 2014 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $275,000 1967
April 2014 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $320,000 1975
April 2014 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $268,000 1967
April 2014 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $353,000 1983
April 2014 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $333,000 1967
April 2014 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $333,000 1967
April 2014 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 13 TO 15 123 m2 $800,000 1996
April 2014 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $421,500 1981
March 2014 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 10 TO 12 92 m2 $538,000 1979
March 2014 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $352,000 1975
March 2014 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $275,000 1983
March 2014 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 16 TO 18 100 m2 $660,000 1996
February 2014 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $558,000 1984
February 2014 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $355,000 1975
January 2014 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $401,000 1981
January 2014 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 10 TO 12 120 m2 $755,000 1997
January 2014 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $330,000 1983
December 2013 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $403,000 1981
December 2013 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $385,000 1976
December 2013 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $570,000 1984
December 2013 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $405,000 1984
December 2013 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $364,000 1981
December 2013 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $320,000 1983
December 2013 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 16 TO 18 117 m2 $695,000 1981
November 2013 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $317,000 1983
November 2013 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $313,000 1975
November 2013 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $311,000 1983
October 2013 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $378,500 1981
October 2013 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $400,000 1981
September 2013 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 82 m2 $465,000 1979
September 2013 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $325,000 1975
September 2013 BUKIT MERAH 141 JLN BT MERAH 4 ROOM New Generation 04 TO 06 92 m2 $520,000 1979
September 2013 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 01 TO 03 103 m2 $615,000 1996
September 2013 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 01 TO 03 117 m2 $610,000 1981
September 2013 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $310,000 1983
August 2013 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 04 TO 06 109 m2 $591,000 1984
August 2013 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 07 TO 09 91 m2 $535,000 1981
August 2013 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $328,000 1975
July 2013 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $324,000 1983
June 2013 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $320,000 1975
June 2013 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 04 TO 06 47 m2 $296,000 1967
June 2013 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 13 TO 15 123 m2 $800,000 1996
June 2013 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 04 TO 06 124 m2 $791,888 1996
June 2013 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 07 TO 09 114 m2 $600,000 1984
June 2013 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 13 TO 15 129 m2 $740,000 1997
June 2013 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $355,000 1975
May 2013 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $392,000 1981
May 2013 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $565,000 1984
May 2013 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 04 TO 06 74 m2 $408,000 1984
May 2013 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $705,000 1979
April 2013 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $695,000 1979
April 2013 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $680,000 1997
April 2013 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 07 TO 09 104 m2 $609,000 1984
April 2013 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $580,000 1997
March 2013 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $365,000 1969
March 2013 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $367,000 1983
March 2013 BUKIT MERAH 144 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $393,000 1981
March 2013 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 10 TO 12 128 m2 $763,000 1997
March 2013 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $390,000 1983
March 2013 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $368,000 1981
February 2013 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $308,000 1975
February 2013 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $357,000 1969
January 2013 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $386,000 1979
January 2013 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 01 TO 03 124 m2 $780,000 1996
January 2013 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $356,000 1970
December 2012 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $309,000 1983
December 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $370,000 1975
December 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $365,000 1975
December 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $380,000 1975
December 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $306,000 1975
November 2012 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $355,000 1969
November 2012 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 10 TO 12 105 m2 $610,000 1996
November 2012 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $718,000 1997
October 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $296,000 1975
October 2012 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 04 TO 06 103 m2 $660,000 1996
October 2012 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $315,000 1975
September 2012 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $312,000 1983
September 2012 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $298,000 1967
September 2012 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $322,000 1983
September 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $355,000 1975
September 2012 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $388,000 1981
September 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $361,000 1970
September 2012 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $336,000 1975
August 2012 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $295,000 1967
August 2012 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $350,000 1969
August 2012 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 04 TO 06 104 m2 $557,000 1984
August 2012 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $375,000 1979
August 2012 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 16 TO 18 60 m2 $366,000 1967
August 2012 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $839,000 1996
August 2012 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $640,000 1996
August 2012 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $370,000 1981
August 2012 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $320,000 1975
August 2012 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $302,000 1983
July 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 71 m2 $365,000 1970
July 2012 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $350,000 1979
July 2012 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $386,000 1976
July 2012 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $370,000 1983
July 2012 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $571,000 1997
July 2012 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $670,000 1979
July 2012 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 75 m2 $438,000 1983
June 2012 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $385,000 1981
June 2012 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $346,000 1967
June 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $305,000 1975
May 2012 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 05 59 m2 $304,000 1975
May 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 11 TO 15 63 m2 $363,000 1970
May 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 05 71 m2 $367,500 1970
May 2012 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 01 TO 05 68 m2 $366,000 1990
May 2012 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 01 TO 05 70 m2 $359,000 1975
May 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 05 63 m2 $345,000 1975
May 2012 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 06 TO 10 108 m2 $592,000 1997
May 2012 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 05 74 m2 $380,000 1984
May 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 06 TO 10 63 m2 $370,000 1970
May 2012 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 11 TO 15 123 m2 $799,000 1996
April 2012 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 05 67 m2 $335,000 1979
April 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 11 TO 15 63 m2 $328,000 1970
April 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 05 59 m2 $294,000 1975
April 2012 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 06 TO 10 60 m2 $355,000 1969
April 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 06 TO 10 70 m2 $390,000 1975
April 2012 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 06 TO 10 67 m2 $376,800 1981
April 2012 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 11 TO 15 60 m2 $340,000 1967
April 2012 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 11 TO 15 47 m2 $300,000 1967
April 2012 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 01 TO 05 108 m2 $615,000 1996
March 2012 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 11 TO 15 67 m2 $352,000 1979
March 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 06 TO 10 63 m2 $385,000 1970
March 2012 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 06 TO 10 81 m2 $398,000 1981
March 2012 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 06 TO 10 70 m2 $395,000 1975
March 2012 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 06 TO 10 63 m2 $360,000 1975
March 2012 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 05 63 m2 $328,000 1970
March 2012 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 16 TO 20 123 m2 $785,000 1996
February 2012 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $345,000 1979
February 2012 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 10 TO 12 105 m2 $570,000 1997
February 2012 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $345,000 1979
February 2012 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $305,000 1975
February 2012 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 01 TO 03 119 m2 $580,000 1979
February 2012 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 04 TO 06 119 m2 $620,000 1979
January 2012 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 82 m2 $400,000 1979
January 2012 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 22 TO 24 127 m2 $790,000 1996
January 2012 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $322,000 1967
January 2012 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 01 TO 03 117 m2 $633,888 1981
December 2011 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 108 m2 $556,000 1997
November 2011 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $311,000 1975
November 2011 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $350,000 1981
November 2011 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $350,000 1969
November 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $371,000 1983
November 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $356,000 1983
October 2011 BUKIT MERAH 12 JLN BT MERAH 4 ROOM Model A 13 TO 15 100 m2 $608,000 1996
October 2011 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $304,000 1975
September 2011 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $283,000 1975
September 2011 BUKIT MERAH 7 JLN BT MERAH 3 ROOM New Generation 04 TO 06 72 m2 $375,000 1990
September 2011 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $352,000 1979
August 2011 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $345,000 1979
August 2011 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 73 m2 $422,000 1975
August 2011 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $358,000 1975
August 2011 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 10 TO 12 92 m2 $480,000 1979
August 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $340,000 1970
August 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $330,000 1970
August 2011 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 76 m2 $450,000 1976
August 2011 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $358,000 1976
July 2011 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $255,000 1967
July 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 82 m2 $373,000 1979
July 2011 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 10 TO 12 65 m2 $408,000 1976
July 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $314,800 1970
July 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $340,000 1979
July 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $338,000 1970
July 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $335,000 1970
July 2011 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 104 m2 $522,000 1984
July 2011 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 16 TO 18 120 m2 $685,000 1997
June 2011 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 07 TO 09 119 m2 $580,000 1979
June 2011 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $333,000 1981
June 2011 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $265,000 1967
June 2011 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 13 TO 15 119 m2 $625,000 1979
May 2011 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 01 TO 03 110 m2 $489,500 1984
May 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $342,000 1970
May 2011 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $323,000 1979
May 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $316,000 1979
May 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $325,000 1983
May 2011 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $339,000 1975
May 2011 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $365,000 1976
May 2011 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $278,000 1975
May 2011 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 19 TO 21 117 m2 $610,000 1981
May 2011 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 13 TO 15 100 m2 $485,000 1981
May 2011 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 10 TO 12 92 m2 $438,000 1979
May 2011 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 07 TO 09 120 m2 $600,000 1997
April 2011 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 76 m2 $400,000 1976
April 2011 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $294,000 1975
April 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $335,000 1979
April 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $337,000 1979
April 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 75 m2 $378,000 1983
April 2011 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 07 TO 09 107 m2 $560,000 1997
March 2011 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $298,000 1975
March 2011 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $285,000 1967
March 2011 BUKIT MERAH 11 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $383,000 1988
February 2011 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $298,000 1975
February 2011 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $344,000 1981
February 2011 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $315,000 1967
February 2011 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 81 m2 $383,000 1981
February 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 75 m2 $371,000 1983
February 2011 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $284,000 1983
February 2011 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $317,000 1970
February 2011 BUKIT MERAH 134 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $613,000 1997
January 2011 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 04 TO 06 47 m2 $255,000 1967
January 2011 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $288,000 1975
January 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $340,000 1983
January 2011 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 81 m2 $390,000 1981
January 2011 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 82 m2 $360,000 1979
January 2011 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $339,000 1983
January 2011 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $275,000 1983
January 2011 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $280,000 1967
January 2011 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $315,000 1981
January 2011 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $290,000 1969
December 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $345,000 1975
December 2010 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $290,000 1983
December 2010 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $315,000 1969
December 2010 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $547,000 1996
December 2010 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 07 TO 09 100 m2 $533,500 1996
December 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $335,000 1983
December 2010 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $272,000 1975
November 2010 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $250,000 1967
November 2010 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $288,000 1975
November 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $335,000 1975
November 2010 BUKIT MERAH 141 JLN BT MERAH 4 ROOM New Generation 07 TO 09 92 m2 $445,000 1979
November 2010 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 10 TO 12 107 m2 $548,000 1997
November 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $335,000 1970
November 2010 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 04 TO 06 94 m2 $370,000 1981
November 2010 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $287,000 1983
October 2010 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $380,000 1976
October 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $316,000 1979
October 2010 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $341,000 1984
October 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $310,000 1975
October 2010 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $325,000 1981
October 2010 BUKIT MERAH 144 JLN BT MERAH 4 ROOM New Generation 07 TO 09 91 m2 $464,000 1981
October 2010 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 10 TO 12 60 m2 $326,000 1967
October 2010 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $302,000 1981
October 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $318,000 1983
October 2010 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 19 TO 21 119 m2 $560,000 1979
September 2010 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $291,000 1975
September 2010 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $280,000 1975
September 2010 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $291,000 1983
September 2010 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 16 TO 18 60 m2 $304,000 1967
September 2010 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $510,000 1997
September 2010 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $308,000 1969
September 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $315,000 1979
September 2010 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 07 TO 09 117 m2 $532,000 1981
August 2010 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $283,000 1975
August 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $335,000 1983
August 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 82 m2 $357,000 1979
August 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $320,000 1979
August 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $331,000 1983
August 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $290,000 1970
August 2010 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $298,000 1967
August 2010 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 13 TO 15 67 m2 $305,000 1981
August 2010 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 01 TO 03 129 m2 $580,000 1997
August 2010 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 07 TO 09 106 m2 $562,500 1996
August 2010 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $320,000 1981
August 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $321,000 1979
August 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $280,000 1979
July 2010 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $262,000 1975
July 2010 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 04 TO 06 74 m2 $365,000 1984
July 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $330,000 1983
July 2010 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 10 TO 12 47 m2 $245,000 1967
July 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 13 TO 15 67 m2 $327,000 1979
July 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $307,000 1979
July 2010 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 07 TO 09 74 m2 $340,000 1984
July 2010 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $315,000 1981
July 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 71 m2 $271,888 1970
July 2010 BUKIT MERAH 11 JLN BT MERAH 3 ROOM New Generation 01 TO 03 82 m2 $370,000 1988
July 2010 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 25 TO 27 127 m2 $738,000 1996
July 2010 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 22 TO 24 119 m2 $606,000 1979
July 2010 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 07 TO 09 107 m2 $548,000 1997
July 2010 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 16 TO 18 123 m2 $682,000 1996
July 2010 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 19 TO 21 127 m2 $680,000 1996
June 2010 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $328,000 1975
June 2010 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $336,000 1976
June 2010 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $266,000 1983
June 2010 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $262,800 1975
June 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $280,000 1979
June 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $313,000 1979
June 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 13 TO 15 63 m2 $340,000 1975
June 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $245,000 1970
June 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $285,000 1970
June 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $285,000 1970
June 2010 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $285,000 1967
June 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $333,000 1983
June 2010 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 04 TO 06 103 m2 $493,000 1997
June 2010 BUKIT MERAH 2 JLN BT MERAH 5 ROOM Adjoined flat 10 TO 12 126 m2 $620,000 1975
June 2010 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Model A 07 TO 09 132 m2 $710,000 1996
May 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $289,000 1979
May 2010 BUKIT MERAH 137 JLN BT MERAH 3 ROOM Improved 10 TO 12 70 m2 $270,000 1975
May 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $306,000 1975
May 2010 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $350,000 1976
May 2010 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $295,000 1975
May 2010 BUKIT MERAH 142 JLN BT MERAH 4 ROOM New Generation 04 TO 06 92 m2 $412,000 1979
May 2010 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 04 TO 06 60 m2 $268,000 1967
May 2010 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $455,000 1997
May 2010 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 01 TO 03 108 m2 $508,000 1997
April 2010 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $265,000 1975
April 2010 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 01 TO 03 74 m2 $305,000 1984
April 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 07 TO 09 64 m2 $326,000 1983
April 2010 BUKIT MERAH 28 JLN BT MERAH 4 ROOM Adjoined flat 04 TO 06 126 m2 $520,000 1967
April 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $245,000 1970
April 2010 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $292,888 1979
April 2010 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 13 TO 15 107 m2 $475,000 1997
April 2010 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 10 TO 12 128 m2 $633,000 1996
April 2010 BUKIT MERAH 140 JLN BT MERAH 5 ROOM Improved 22 TO 24 119 m2 $500,000 1979
April 2010 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 01 TO 03 103 m2 $495,000 1996
April 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $270,000 1970
April 2010 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $318,000 1976
March 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $290,000 1975
March 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $275,000 1979
March 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 01 TO 03 63 m2 $246,000 1970
March 2010 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 81 m2 $340,000 1981
March 2010 BUKIT MERAH 108 JLN BT MERAH 3 ROOM Model A 04 TO 06 74 m2 $339,000 1984
March 2010 BUKIT MERAH 12 JLN BT MERAH 5 ROOM Improved 07 TO 09 122 m2 $625,000 1996
March 2010 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 01 TO 03 105 m2 $436,000 1984
March 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $263,000 1970
March 2010 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 16 TO 18 123 m2 $645,000 1996
March 2010 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Improved 01 TO 03 120 m2 $500,088 1997
March 2010 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $292,000 1975
February 2010 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $264,000 1983
February 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $298,000 1979
February 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $278,000 1979
February 2010 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 10 TO 12 65 m2 $310,000 1976
February 2010 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $268,000 1969
February 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 07 TO 09 63 m2 $265,000 1970
February 2010 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $245,000 1970
February 2010 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $320,000 1981
February 2010 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $305,000 1983
February 2010 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 10 TO 12 114 m2 $459,388 1984
February 2010 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $580,000 1997
February 2010 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 10 TO 12 123 m2 $624,800 1996
January 2010 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $258,000 1983
January 2010 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 07 TO 09 67 m2 $273,000 1979
January 2010 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 16 TO 18 100 m2 $545,000 1996
January 2010 BUKIT MERAH 13 JLN BT MERAH 4 ROOM Model A 10 TO 12 106 m2 $498,000 1996
January 2010 BUKIT MERAH 109 JLN BT MERAH 4 ROOM Model A 13 TO 15 104 m2 $445,000 1984
January 2010 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 10 TO 12 71 m2 $315,000 1969
January 2010 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 13 TO 15 67 m2 $290,000 1981
December 2009 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 07 TO 09 63 m2 $300,000 1975
December 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $312,000 1976
December 2009 BUKIT MERAH 135 JLN BT MERAH 4 ROOM Model A 04 TO 06 107 m2 $480,000 1997
December 2009 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 07 TO 09 117 m2 $495,000 1981
December 2009 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $305,000 1979
December 2009 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 01 TO 03 47 m2 $208,000 1967
November 2009 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $228,000 1967
November 2009 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 13 TO 15 47 m2 $206,999 1967
November 2009 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 04 TO 06 117 m2 $478,000 1981
November 2009 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 04 TO 06 124 m2 $545,000 1996
November 2009 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 13 TO 15 127 m2 $605,000 1996
November 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $285,000 1983
November 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $315,000 1983
November 2009 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 129 m2 $563,000 1997
November 2009 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $280,000 1975
November 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 01 TO 03 59 m2 $241,000 1975
October 2009 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $250,000 1983
October 2009 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $258,000 1979
October 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $303,000 1976
October 2009 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $237,000 1983
October 2009 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $262,500 1981
October 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $255,000 1970
October 2009 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 01 TO 03 60 m2 $241,000 1967
October 2009 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 10 TO 12 67 m2 $290,000 1979
October 2009 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $278,500 1975
September 2009 BUKIT MERAH 136 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $229,000 1975
September 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 70 m2 $276,000 1975
September 2009 BUKIT MERAH 146 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $271,000 1981
September 2009 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 01 TO 03 110 m2 $375,000 1984
September 2009 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 01 TO 03 61 m2 $225,000 1969
September 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $257,000 1983
September 2009 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 07 TO 09 47 m2 $190,000 1967
September 2009 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 13 TO 15 123 m2 $610,000 1996
September 2009 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 01 TO 03 124 m2 $535,000 1996
September 2009 BUKIT MERAH 13 JLN BT MERAH 5 ROOM Improved 07 TO 09 127 m2 $618,000 1996
September 2009 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 07 TO 09 108 m2 $455,000 1997
September 2009 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 07 TO 09 121 m2 $540,000 1997
August 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $230,000 1975
August 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 10 TO 12 59 m2 $240,000 1975
August 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $238,000 1970
August 2009 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 01 TO 03 63 m2 $282,000 1975
August 2009 BUKIT MERAH 134 JLN BT MERAH 4 ROOM Model A 13 TO 15 108 m2 $450,000 1997
August 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 07 TO 09 65 m2 $293,000 1976
August 2009 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 07 TO 09 59 m2 $246,800 1983
August 2009 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $226,000 1983
July 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 04 TO 06 64 m2 $275,000 1983
July 2009 BUKIT MERAH 2 JLN BT MERAH 3 ROOM Improved 04 TO 06 63 m2 $279,000 1975
July 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $240,000 1975
July 2009 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 07 TO 09 60 m2 $238,000 1967
July 2009 BUKIT MERAH 139 JLN BT MERAH 4 ROOM Model A 01 TO 03 107 m2 $406,000 1997
July 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $243,000 1970
July 2009 BUKIT MERAH 145 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $284,000 1981
July 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $236,000 1975
July 2009 BUKIT MERAH 143 JLN BT MERAH 5 ROOM Improved 01 TO 03 117 m2 $475,000 1981
July 2009 BUKIT MERAH 146 JLN BT MERAH 4 ROOM New Generation 01 TO 03 102 m2 $400,000 1981
July 2009 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 13 TO 15 129 m2 $558,000 1997
June 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 10 TO 12 64 m2 $300,000 1983
June 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 76 m2 $305,000 1976
June 2009 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $256,000 1979
June 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $235,000 1970
June 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $251,000 1970
June 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 04 TO 06 63 m2 $237,000 1970
June 2009 BUKIT MERAH 142 JLN BT MERAH 3 ROOM New Generation 01 TO 03 67 m2 $270,000 1979
June 2009 BUKIT MERAH 139 JLN BT MERAH 5 ROOM Improved 04 TO 06 121 m2 $515,000 1997
June 2009 BUKIT MERAH 14 JLN BT MERAH 4 ROOM Model A 19 TO 21 100 m2 $510,000 1996
May 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $270,000 1983
May 2009 BUKIT MERAH 135 JLN BT MERAH 5 ROOM Model A 13 TO 15 132 m2 $568,888 1997
May 2009 BUKIT MERAH 144 JLN BT MERAH 4 ROOM New Generation 01 TO 03 91 m2 $365,000 1981
May 2009 BUKIT MERAH 28 JLN BT MERAH 3 ROOM Standard 16 TO 18 60 m2 $235,000 1967
April 2009 BUKIT MERAH 138 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $222,000 1983
April 2009 BUKIT MERAH 28 JLN BT MERAH 2 ROOM Standard 13 TO 15 47 m2 $187,000 1967
April 2009 BUKIT MERAH 1 JLN BT MERAH 3 ROOM Improved 13 TO 15 64 m2 $270,000 1983
April 2009 BUKIT MERAH 113 JLN BT MERAH 3 ROOM Standard 07 TO 09 71 m2 $268,000 1969
April 2009 BUKIT MERAH 141 JLN BT MERAH 3 ROOM New Generation 04 TO 06 67 m2 $280,000 1979
April 2009 BUKIT MERAH 133 JLN BT MERAH 3 ROOM Improved 04 TO 06 59 m2 $240,000 1983
April 2009 BUKIT MERAH 132 JLN BT MERAH 3 ROOM Improved 10 TO 12 70 m2 $258,000 1975
April 2009 BUKIT MERAH 108 JLN BT MERAH 4 ROOM Model A 10 TO 12 114 m2 $443,000 1984
April 2009 BUKIT MERAH 107 JLN BT MERAH 3 ROOM Standard 10 TO 12 63 m2 $240,800 1970
April 2009 BUKIT MERAH 14 JLN BT MERAH 5 ROOM Improved 10 TO 12 127 m2 $597,000 1996
April 2009 BUKIT MERAH 145 JLN BT MERAH 4 ROOM New Generation 04 TO 06 91 m2 $385,000 1981
March 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 01 TO 03 65 m2 $270,000 1976
March 2009 BUKIT MERAH 131 JLN BT MERAH 3 ROOM Improved 04 TO 06 65 m2 $267,000 1976

See also: Jln Bt Merah HDB Rental Price